April 3, 2009 Coordinator Report Next year's budget is coming into better focus. The outlook is much better than I had projected because we used worst case assumptions. We looked to be within $10,000 of having no excess capacity to tax. Following my discussions with our DOR representative I have made some changes to estimated receipts that improve our picture from the revenue side by $45,000. This reflects expected FEMA ice storm reimbursement. If we realize the funds during this fiscal year we will book them to current snow / ice shortfall to the same effect. The assessor's may be able to release $7,000 overlay balance to become additional revenue. On the expense side the PVRS budget proposal stands at $7000 less than last year's assessment. We had assumed a 5% increase. That is a big swing. On April 16 the regional school will consider further cuts. The final big shift is that our draft budget had assumed the same ice and snow deficit as last year but the real number will be lower. The actual number for the current year will still be at least $10,000 more than the increased appropriation that is in the budget proposal, the nine-year average of $102,000. We hadn't specified the matter of governance of the enterprise accounts the town meeting established. That had me worried that we lacked a legal basis for who is in charge. I learned that the default turns out to be the Selectboard so no action is required. The board needs to carefully consider whether they want to have Town Meeting assign that responsibility as my draft motions suggest. This is an important matter. I have reservations about doing so which we can discuss. Once established an EF has a minimum life of three years. Broadband system made some progress this last week. Most of the groundwork at the cell tower is complete. National Grid has restored the downed lines. We are ready for our contractor to complete installation. If weather permits we expect this the week of April 6th. To date we have twenty-five households who have requested a signal strength test or immediate service. My contact at DOR says we oughtn't to reflect Chapter 90 highway funds as revenues, as they are a special grant. This comes from our efforts to consider designating some of these funds to pay for wages and expenses of highway department thus reducing the levy. So long as we have an approved project we may do so. In order to affect the savings the board can direct the department not to expend appropriated funds. This is something to consider. We got the new truck back and repaired. We have the insurance check to repair the garage and work will soon proceed. Each cost the department the $500 deductible. FY2010 Chapter 90 highway grant funds were awarded in the amount of $173,315. I asked Tim to bring the WCS some sand for the sandbox and to see if the department can repair the damage to the chain link fence at the transfer station. Tim reports that the tag-along sweeper is getting weak and he may put in for a replacement next year. I reviewed the current YTD financial reports thru March. Have a reserve fund request in to meet the MIIA worker comp audited premium bill. This results from FY08 payroll growth. This basis drives FY10 deposit premium and the reality is reflected the proposed budget. The recreation committee reports that they are started the youth baseball program the town funded with a one-time increase to their budget this year. Charlie has been keeping on top of the town hall boiler which has failed to fire a couple of occasions. He had to swap out the sump pump after we experienced high water. Was not a high water event. Last summer Tim got some high tech gear in town to locate the plugged culvert that runs from the town hall catch basin to the area between the Inn and Library. The pipe crosses the Inn parking lot and then takes a turn under the trees behind the underground fire dept water tank. I have obtained permission to cut three trees and excavate to try and get the pipe open. If successful we can use gravity instead of electricity to keep the town hall basement from flooding. The owner this winter granted us permission to dump snow on her property with the understanding that while we are digging we will unbury the Inn's curtain drains which years of piling snow have blocked. This spring we will relocate the solar collector lighting the Veteran's monument and flag to the rear to be less obtrusive. Perhaps we can make an educational solar electric project out of the activity, something the Steve and Janice suggested at the onset. I continue to collect telephone quality of service reports. Submitted the FY09 Community Policing budget for the PD. Processed payment requests for town bills including firefighter training. Received annual town meeting petition article that asks to appropriate $10,000 to pay call firefighters. Met with finance committee and broadband committee. Scheduled town hall use / events. This month includes: Easter breakfast, Wooden Fender Young Artist Concert, Dinner Theater, Tai Chi, Road clean-up, and the pre town meeting. David Young Town Coordinator